SKU: CTR-AP2-AP3 Brand:

Control timer Tribotec AP2/AP3

Control and monitoring timers for stationary progressive and multi-line systems: lubrication time or cycle count, pause, error and level monitoring.

ManufacturerTribotec
Series
TypeControl units
Temperature-10…+60 °C
Supply voltageAP2: 24 V DC (control); AP3: 12 / 24 V DC
Full specification table below on this page

Special pricing for regular customers

Detailed description

AP2 and AP3: control timers for circuits with or without electrical distributor signalling, including control of electrically driven pumps. They set lubrication time or number of cycles plus pause, and keep cycle status during a power cut.

Features

  • Settable lubrication time or number of cycles and pause time
  • Cycle status memory during supply voltage cut-off
  • System error evaluation, reservoir level signalling, outputs for remote signalling
  • AP2: for 230/400 V pumps, control voltage 24 V DC, IP65
  • AP2: lubrication 1…59 s / 1…99 min, pause up to 1…99 h, 1…99 cycles
  • AP3: supply 12 / 24 V DC, IP56 or IP65
  • Operating temperature -10…+60 °C

Applications

Stationary progressive and multi-line lubrication systems.

Specifications

ManufacturerTribotec
Series
TypeControl units
Temperature-10…+60 °C
Supply voltageAP2: 24 V DC (control); AP3: 12 / 24 V DC

Delivery and payment

Pickup in Lviv
79024, B. Khmelnytskoho St., 176, Lviv. Mon-Fri: 08:30-18:30
Nova Poshta / Ukrposhta

Same-day shipping for in-stock items once payment is received.

Bank transfer

Invoice for companies and sole proprietors, VAT included.

Why customers choose us

Custom solutions

We design cylinders for the client’s specific task rather than picking them from a catalogue.

Quality and reliability

Only proven components and quality control at every production stage.

Fast turnaround

Quick approvals, manufacturing and delivery without delays.

A simple process - 6 steps

How ordering works

Start with a call

01

Enquiry

A call, an email or a form on the site - we record your requirement.

02

Technical brief

We collect the parameters: pressure, stroke, mounting, drawing or sample.

03

Design and quote

We calculate cost and lead time, then agree the solution.

04

Manufacturing

We manufacture at our own facility or ship from stock.

05

Quality control

Bench testing: tightness and performance under pressure.

06

Delivery

Nova Poshta, pickup, or direct delivery to your site.