SKU: VLV-DPE Brand:

Electric two-line change-over valve Tribotec DPE, 400 bar

Electric change-over valve for two-line systems, installed behind the pump: 230 V AC or 24 V DC, up to 400 bar, IP54.

ManufacturerTribotec
Series
TypeValves and change-over valves
Max operating pressure400 bar
Working mediumOil / grease
Temperature-25…+80 °C
DriveElectric
Supply voltage230 V AC, 24 V DC
Grease NLGI classup to 2
Full specification table below on this page

Special pricing for regular customers

Detailed description

DPE: electric two-line change-over valve that alternates lubricant supply into both main lines. It is installed behind the pump outlet (e.g. Z1), either standalone in the piping or together with the pump on a bedplate.

Features

  • Supply 230 V AC or 24 V DC, also 415 V and 110 V AC
  • Max 400 bar, working 350 bar
  • Grease up to NLGI 2 or oil min. 50 mm²/s
  • IP54, switching time 0.5 s, 180° rotation, power 24 W
  • Connections G1/2 or M16 x 1.5; horizontal mounting
  • Temperature -25…+80 °C; weight 13.6 kg

Applications

Two-line central lubrication systems, installed behind the pump.

Specifications

ManufacturerTribotec
Series
TypeValves and change-over valves
Max operating pressure400 bar
Working mediumOil / grease
Temperature-25…+80 °C
DriveElectric
Supply voltage230 V AC, 24 V DC
Grease NLGI classup to 2

Delivery and payment

Pickup in Lviv
79024, B. Khmelnytskoho St., 176, Lviv. Mon-Fri: 08:30-18:30
Nova Poshta / Ukrposhta

Same-day shipping for in-stock items once payment is received.

Bank transfer

Invoice for companies and sole proprietors, VAT included.

Why customers choose us

Custom solutions

We design cylinders for the client’s specific task rather than picking them from a catalogue.

Quality and reliability

Only proven components and quality control at every production stage.

Fast turnaround

Quick approvals, manufacturing and delivery without delays.

A simple process - 6 steps

How ordering works

Start with a call

01

Enquiry

A call, an email or a form on the site - we record your requirement.

02

Technical brief

We collect the parameters: pressure, stroke, mounting, drawing or sample.

03

Design and quote

We calculate cost and lead time, then agree the solution.

04

Manufacturing

We manufacture at our own facility or ship from stock.

05

Quality control

Bench testing: tightness and performance under pressure.

06

Delivery

Nova Poshta, pickup, or direct delivery to your site.