SKU: VLV-DPT3 Brand:

Hydraulic two-line change-over valve Tribotec DPT 3, 400 bar

Hydraulic change-over valve for two-line oil and grease systems: change-over pressure 50…380 bar, flow up to 400 cm³/min.

ManufacturerTribotec
Series
TypeValves and change-over valves
Max operating pressure400 bar
Port connection
Working mediumOil / grease
Temperature-25…+70 °C
Deliveryup to 400 cm³/min
DriveHydraulic
Grease NLGI classup to 2
Full specification table below on this page

Special pricing for regular customers

Detailed description

DPT 3: hydraulic two-line change-over valve installed as a standalone component of the circuit. Once the set pressure is reached, it switches the lubricant flow from one main line to the other.

Features

  • Compatible with distributors DLDA, DLDC, DLDD, DLDF, ZVM and pumps Z1, BEG-R, UCF, BPG
  • Max 400 bar, working 350 bar, change-over pressure adjustable 50…380 bar
  • Max flow 400 cm³/min
  • Oil or grease up to NLGI 2; -25…+70 °C
  • Connections M16 x 1.5; mounting via 4 x ø9 holes in any position; weight 13.75 kg
  • Version with 0…600 bar manometer or without

Applications

Central lubrication systems with any type of two-line distributor or pump.

Specifications

ManufacturerTribotec
Series
TypeValves and change-over valves
Max operating pressure400 bar
Port connection
Working mediumOil / grease
Temperature-25…+70 °C
Deliveryup to 400 cm³/min
DriveHydraulic
Grease NLGI classup to 2

Delivery and payment

Pickup in Lviv
79024, B. Khmelnytskoho St., 176, Lviv. Mon-Fri: 08:30-18:30
Nova Poshta / Ukrposhta

Same-day shipping for in-stock items once payment is received.

Bank transfer

Invoice for companies and sole proprietors, VAT included.

Why customers choose us

Custom solutions

We design cylinders for the client’s specific task rather than picking them from a catalogue.

Quality and reliability

Only proven components and quality control at every production stage.

Fast turnaround

Quick approvals, manufacturing and delivery without delays.

A simple process - 6 steps

How ordering works

Start with a call

01

Enquiry

A call, an email or a form on the site - we record your requirement.

02

Technical brief

We collect the parameters: pressure, stroke, mounting, drawing or sample.

03

Design and quote

We calculate cost and lead time, then agree the solution.

04

Manufacturing

We manufacture at our own facility or ship from stock.

05

Quality control

Bench testing: tightness and performance under pressure.

06

Delivery

Nova Poshta, pickup, or direct delivery to your site.